METRICS IN TESTING

Metrics Used In Testing
The Product Quality Measures - 1. Customer satisfaction index, 2. Delivered defect quantities, 3. Responsiveness (turnaround time) to users, 4. Product volatility, 5. Defect ratios, 6. Defect removal efficiency, 7. Complexity of delivered product, 8. Test coverage, 9. Cost of defects, 10. Costs of quality activities, 11. Re-work, 12. Reliability and Metrics for Evaluating Application System Testing.

The Product Quality Measures:
1. Customer satisfaction index

This index is surveyed before product delivery and after product delivery
(and on-going on a periodic basis, using standard questionnaires).The following are analyzed:

Number of system enhancement requests per year
Number of maintenance fix requests per year
User friendliness: call volume to customer service hotline
User friendliness: training time per new user
Number of product recalls or fix releases (software vendors)
Number of production re-runs (in-house information systems groups)
2. Delivered defect quantities

They are normalized per function point (or per LOC) at product delivery (first 3 months or first year of operation) or Ongoing (per year of operation) by level of severity, by category or cause, e.g.: requirements defect, design defect, code defect, documentation/on-line help defect, defect introduced by fixes, etc.

3. Responsiveness (turnaround time) to users

Turnaround time for defect fixes, by level of severity
Time for minor vs. major enhancements; actual vs. planned elapsed time
4. Product volatility

Ratio of maintenance fixes (to repair the system & bring it into compliance with specifications), vs. enhancement requests (requests by users to enhance or change functionality)
5. Defect ratios

Defects found after product delivery per function point.
Defects found after product delivery per LOC
Pre-delivery defects: annual post-delivery defects
Defects per function point of the system modifications
6. Defect removal efficiency

Number of post-release defects (found by clients in field operation), categorized by level of severity
Ratio of defects found internally prior to release (via inspections and testing), as a percentage of all defects
All defects include defects found internally plus externally (by customers) in the first year after product delivery
7. Complexity of delivered product

McCabe's cyclomatic complexity counts across the system
Halstead’s measure
Card's design complexity measures
Predicted defects and maintenance costs, based on complexity measures

8. Test coverage

Breadth of functional coverage
Percentage of paths, branches or conditions that were actually tested
Percentage by criticality level: perceived level of risk of paths
The ratio of the number of detected faults to the number of predicted faults.

9. Cost of defects

Business losses per defect that occurs during operation
Business interruption costs; costs of work-arounds
Lost sales and lost goodwill
Litigation costs resulting from defects
Annual maintenance cost (per function point)
Annual operating cost (per function point)
Measurable damage to your boss's career

10. Costs of quality activities

Costs of reviews, inspections and preventive measures
Costs of test planning and preparation
Costs of test execution, defect tracking, version and change control
Costs of diagnostics, debugging and fixing
Costs of tools and tool support
Costs of test case library maintenance
Costs of testing & QA education associated with the product
Costs of monitoring and oversight by the QA organization (if separate from the development and test organizations)

11. Re-work

Re-work effort (hours, as a percentage of the original coding hours)
Re-worked LOC (source lines of code, as a percentage of the total delivered LOC)
Re-worked software components (as a percentage of the total delivered components)
12. Reliability

Availability (percentage of time a system is available, versus the time the system is needed to be available)
Mean time between failure (MTBF).
Man time to repair (MTTR)
Reliability ratio (MTBF / MTTR)
Number of product recalls or fix releases
Number of production re-runs as a ratio of production runs

Metrics for Evaluating Application System Testing:
Metric = Formula

Test Coverage = Number of units (KLOC/FP) tested / total size of the system. (LOC represents Lines of Code)

Number of tests per unit size = Number of test cases per KLOC/FP (LOC represents Lines of Code).

Acceptance criteria tested = Acceptance criteria tested / total acceptance criteria

Defects per size = Defects detected / system size

Test cost (in %) = Cost of testing / total cost *100

Cost to locate defect = Cost of testing / the number of defects located

Achieving Budget = Actual cost of testing / Budgeted cost of testing

Defects detected in testing = Defects detected in testing / total system defects

Defects detected in production = Defects detected in production/system size

Quality of Testing = No of defects found during Testing/(No of defects found during testing + No of acceptance defects found after delivery) *100

Effectiveness of testing to business = Loss due to problems / total resources processed by the system.

System complaints = Number of third party complaints / number of transactions processed

Scale of Ten = Assessment of testing by giving rating in scale of 1 to 10

Source Code Analysis = Number of source code statements changed / total number of tests.

Effort Productivity = Test Planning Productivity = No of Test cases designed / Actual Effort for Design and Documentation

Test Execution Productivity = No of Test cycles executed / Actual Effort for testing

Bug Identification

Bug Reporting
This article highlights the essence and traits of finding bugs. It leaps to redefine the art, a tester should inculcate while finding a bug. It enumerates various artifacts in reporting a bug. Whereas, also voices the advocacy on the bugs that has been reported. The basic amenity of a tester being to fight for the bug until it is fixed.

Introduction:
As testers, we all agree to the fact that the basic aim of the Tester is to decipher bugs. Whenever a build appears for testing, the primary objective is to find out as many bugs as possible from every corner of the application. To accomplish this task as perfection, we perform testing from various perspectives. We strain the application before us through various kinds of strainers like boundary value analysis, validation checks, verification checks, GUI, interoperability, integration tests, functional – business concepts checking, backend testing (like using SQL commands into db or injections), security tests, and many more. This makes us to drill deep into the application as well as the business.



We would agree to the fact that Bug Awareness is of no use until it is well documented. Here comes the role of BUG REPORTS. The bug reports are our primary work product. This is what people outside the testing group notices. These reports play an important role in the Software Development Life Cycle – in various phases as they are referenced by testers, developers, managers, top shots and not to forget the clients who these days demand for the test reports. So, the Bug Reports are remembered the most.



Once the bugs are reported by the testers and submitted to the developers to work upon, we often see some kinds of confrontations – there are humiliations which testers face sometimes, there are cold wars – nonetheless the discussions take the shape of mini quarrels – but at times testers and developers still say the same thing or they are correct but the depiction of their understanding are different and that makes all the differences. In such a situation, we come to a stand-apart that the best tester is not the one who finds most of the bugs or the one who embarrasses most programmers but is the one who gets most of the bugs fixed.



Bug Reporting
The first aim of the Bug Report is to let the programmer see the failure. The Bug Report gives the detailed descriptions so that the programmers can make the Bug fail for them. In case, the Bug Report does not accomplish this mission, there can be back flows from the development team saying – not a bug, cannot reproduce and many other reasons.



Hence it is important that the BUG REPORT be prepared by the testers with utmost proficiency and specificity. It should basically describe the famous 3 What's, well described as:



What we did:



Module, Page/Window – names that we navigate to
Test data entered and selected
Buttons and the order of clicking
What we saw:



GUI Flaws
Missing or No Validations
Error messages
Incorrect Navigations
What we expected to see:



GUI Flaw: give screenshots with highlight
Incorrect message – give correct language, message
Validations – give correct validations
Error messages – justify with screenshots
Navigations – mention the actual pages
Pointers to effective reporting can be well derived from above three What's. These are:



1. BUG DESCRIPTION should be clearly identifiable – a bug description is a short statement that briefly describes what exactly a problem is. Might be a problem required 5-6 steps to be produced, but this statement should clearly identify what exactly a problem is. Problem might be a server error. But description should be clear saying Server Error occurs while saving a new record in the Add Contact window.



2. Bug should be reported after building a proper context – PRE-CONDITIONS for reproducing the bug should be defined so as to reach the exact point where bug can be reproduced. For example: If a server error appears while editing a record in the contacts list, then it should be well defined as a pre-condition to create a new contact and save successfully. Double click this created contact from the contacts list to open the contact details – make changes and hit save button.



3. STEPS should be clear with short and meaningful sentences – nobody would wish to study the entire paragraph of long complex words and sentences. Make your report step wise by numbering 1,2,3…Make each sentence small and clear. Only write those findings or observations which are necessary for this respective bug. Writing facts that are already known or something which does not help in reproducing a bug makes the report unnecessarily complex and lengthy.



4. Cite examples wherever necessary – combination of values, test data: Most of the times it happens that the bug can be reproduced only with a specific set of data or values. Hence, instead of writing ambiguous statement like enter an invalid phone number and hit save…one should mention the data/value entered….like enter the phone number as 012aaa@$%.- and save.



5. Give references to specifications – If any bug arises that is a contradictive to the SRS or any functional document of the project for that matter then it is always proactive to mention the section, page number for reference. For example: Refer page 14 of SRS section 2-14.



6. Report without passing any kind of judgment in the bug descriptions – the bug report should not be judgmental in any case as this leads to controversy and gives an impression of bossy. Remember, a tester should always be polite so as to keep his bug up and meaningful. Being judgmental makes developers think as though testers know more than them and as a result gives birth to a psychological adversity. To avoid this, we can use the word suggestion – and discuss with the developers or team lead about this. We can also refer to some application or some module or some page in the same application to strengthen our point.



7. Assign severity and priority – SEVERITY is the state or quality of being severe. Severity tells us HOW BAD the BUG is. It defines the importance of BUG from FUNCTIONALITY point of view and implies adherence to rigorous standards or high principles. Severity levels can be defined as follows:



Urgent/Show – stopper: Like system crash or error message forcing to close the window, System stops working totally or partially. A major area of the users system is affected by the incident and It is significant to business processes.



Medium/Workaround: When a problem is required in the specs but tester can go on with testing. It affects a more isolated piece of functionality. It occurs only at one or two customers or is intermittent.



Low: Failures that are unlikely to occur in normal use. Problems do not impact use of the product in any substantive way. Have no or very low impact to business processes
State exact error messages.



PRIORITY means something Deserves Prior Attention. It represents the importance of a bug from Customer point of view. Voices precedence established by urgency and it is associated with scheduling a bug Priority Levels can be defined as follows:



High: This has a major impact on the customer. This must be fixed immediately.



Medium: This has a major impact on the customer. The problem should be fixed before release of the current version in development or a patch must be issued if possible.



Low: This has a minor impact on the customer. The flaw should be fixed if there is time, but it can be deferred until the next release.

8. Provide Screenshots – This is the best approach. For any error say object references, server error, GUI issues, message prompts and any other errors that we can see – should always be saved as a screenshot and be attached to the bug for the proof. It helps the developers understand the issue more specifically

Wednesday, October 7, 2009

MAIN OBJECTIVES OF TESTING

Objectives of Testing

Finding of Errors - Primary Goal
Trying to prove that software does not work. Thus, indirectly verifying that software meets requirements
Software Testing
Software testing is the process of testing the functionality and correctness of software by running it. Software testing is usually performed for one of two reasons:
(1) defect detection
(2) reliability or Process of executing a computer program and comparing the actual behavior with the expected behavior

What is the goal of Software Testing?

* Demonstrate That Faults Are Not Present
* Find Errors
* Ensure That All The Functionality Is Implemented
* Ensure The Customer Will Be Able To Get His Work Done

Modes of Testing
* Static Static Analysis doesn¡¦t involve actual program execution. The code is examined, it is tested without being executed Ex: - Reviews
* Dynamic In Dynamic, The code is executed. Ex:- Unit testing

Testing methods
* White box testing Use the control structure of the procedural design to derive test cases.
* Black box testing Derive sets of input conditions that will fully exercise the functional requirements for a program.
* Integration Assembling parts of a system

Verification and Validation

* Verification: Are we doing the job right? The set of activities that ensure that software correctly implements a specific function. (i.e. The process of determining whether or not products of a given phase of the software development cycle fulfill the requirements established during previous phase). Ex: - Technical reviews, quality & configuration audits, performance monitoring, simulation, feasibility study, documentation review, database review, algorithm analysis etc
* Validation: Are we doing the right job? The set of activities that ensure that the software that has been built is traceable to customer requirements.(An attempt to find errors by executing the program in a real environment ). Ex: - Unit testing, system testing and installation testing etc

What's a 'test case'?
A test case is a document that describes an input, action, or event and an expected response, to determine if a feature of an application is working correctly. A test case should contain particulars such as test case identifier, test case name, objective, test conditions/setup, input data requirements, steps, and expected results

What is a software error ?

A mismatch between the program and its specification is an error in the program if and only if the specifications exists and is correct.

Risk Driven Testing
What if there isn't enough time for thorough testing?
Use risk analysis to determine where testing should be focused. Since it's rarely possible to test every possible aspect of an application, every possible combination of events, every dependency, or everything that could go wrong, risk analysis is appropriate to most software development projects. This requires judgement skills, common sense, and experience.

Considerations can include:
- Which functionality is most important to the project's intended purpose?
- Which functionality is most visible to the user?
- Which aspects of the application are most important to the customer?
- Which parts of the code are most complex, and thus most subject to errors?
- What do the developers think are the highest-risk aspects of the application?
- What kinds of tests could easily cover multiple functionality?
Whenever there's too much to do and not enough time to do it, we have to prioritize so that at least the most important things get done. So prioritization has received a lot of attention. The approach is called Risk Driven Testing. Here's how you do it: Take the pieces of your system, whatever you use - modules, functions, section of the requirements - and rate each piece on two variables, Impact and Likelihood.

Monday, October 5, 2009

PERFORMANCE vs LOAD vs STRESS TESTING

Performance Vs. Load Vs. Stress Testing

Here's a good interview question for a tester: how do you define performance/load/stress testing? Many times people use these terms interchangeably, but they have in fact quite different meanings. This post is a quick review of these concepts, based on my own experience, but also using definitions from testing literature -- in particular: "Testing computer software" by Kaner et al, "Software testing techniques" by Loveland et al, and "Testing applications on the Web" by Nguyen et al.

Performance testing

The goal of performance testing is not to find bugs, but to eliminate bottlenecks and establish a baseline for future regression testing. To conduct performance testing is to engage in a carefully controlled process of measurement and analysis. Ideally, the software under test is already stable enough so that this process can proceed smoothly.

A clearly defined set of expectations is essential for meaningful performance testing. If you don't know where you want to go in terms of the performance of the system, then it matters little which direction you take (remember Alice and the Cheshire Cat?). For example, for a Web application, you need to know at least two things:
expected load in terms of concurrent users or HTTP connections
acceptable response time
Once you know where you want to be, you can start on your way there by constantly increasing the load on the system while looking for bottlenecks. To take again the example of a Web application, these bottlenecks can exist at multiple levels, and to pinpoint them you can use a variety of tools:
.at the application level, developers can use profilers to spot inefficiencies in their code (for example poor search algorithms)

.at the database level, developers and DBAs can use database-specific profilers and query optimizers
at the operating system level, system engineers can use utilities such as top, vmstat, iostat (on Unix-type systems) and PerfMon (on Windows) to monitor hardware resources such as CPU, memory, swap, disk I/O; specialized kernel monitoring software can also be used
.at the network level, network engineers can use packet sniffers such as tcpdump, network protocol analyzers such as ethereal, and various utilities such as netstat, MRTG, ntop, mii-tool

From a testing point of view, the activities described above all take a white-box approach, where the system is inspected and monitored "from the inside out" and from a variety of angles. Measurements are taken and analyzed, and as a result, tuning is done.

However, testers also take a black-box approach in running the load tests against the system under test. For a Web application, testers will use tools that simulate concurrent users/HTTP connections and measure response times. Some lightweight open source tools I've used in the past for this purpose are ab, siege, httperf. A more heavyweight tool I haven't used yet is OpenSTA. I also haven't used The Grinder yet, but it is high on my TODO list.

When the results of the load test indicate that performance of the system does not meet its expected goals, it is time for tuning, starting with the application and the database. You want to make sure your code runs as efficiently as possible and your database is optimized on a given OS/hardware configurations. TDD practitioners will find very useful in this context a framework such as Mike Clark's jUnitPerf, which enhances existing unit test code with load test and timed test functionality. Once a particular function or method has been profiled and tuned, developers can then wrap its unit tests in jUnitPerf and ensure that it meets performance requirements of load and timing.

If, after tuning the application and the database, the system still doesn't meet its expected goals in terms of performance, a wide array of tuning procedures is available at the all the levels discussed before. Here are some examples of things you can do to enhance the performance of a Web application outside of the application code per se:
Use Web cache mechanisms, such as the one provided by Squid
Publish highly-requested Web pages statically, so that they don't hit the database
Scale the Web server farm horizontally via load balancing
Scale the database servers horizontally and split them into read/write servers and read-only servers, then load balance the read-only servers
Scale the Web and database servers vertically, by adding more hardware resources (CPU, RAM, disks)
Increase the available network bandwidth

Performance tuning can sometimes be more art than science, due to the sheer complexity of the systems involved in a modern Web application. Care must be taken to modify one variable at a time and redo the measurements, otherwise multiple changes can have subtle interactions that are hard to qualify and repeat.

In a standard test environment such as a test lab, it will not always be possible to replicate the production server configuration. In such cases, a staging environment is used which is a subset of the production environment. The expected performance of the system needs to be scaled down accordingly.

The cycle "run load test->measure performance->tune system" is repeated until the system under test achieves the expected levels of performance. At this point, testers have a baseline for how the system behaves under normal conditions. This baseline can then be used in regression tests to gauge how well a new version of the software performs.

Another common goal of performance testing is to establish benchmark numbers for the system under test. There are many industry-standard benchmarks such as the ones published by TPC, and many hardware/software vendors will fine-tune their systems in such ways as to obtain a high ranking in the TCP top-tens. It is common knowledge that one needs to be wary of any performance claims that do not include a detailed specification of all the hardware and software configurations that were used in that particular test.

Load testing


We have already seen load testing as part of the process of performance testing and tuning. In that context, it meant constantly increasing the load on the system via automated tools. For a Web application, the load is defined in terms of concurrent users or HTTP connections.

In the testing literature, the term "load testing" is usually defined as the process of exercising the system under test by feeding it the largest tasks it can operate with. Load testing is sometimes called volume testing, or longevity/endurance testing.

Examples of volume
testing a word processor by editing a very large document
testing a printer by sending it a very large job
testing a mail server with thousands of users mailboxes
a specific case of volume testing is zero-volume testing, where the system is fed empty tasks
Examples of longevity/endurance testing:
testing a client-server application by running the client in a loop against the server over an extended period of time
Goals of load testing:
expose bugs that do not surface in cursory testing, such as memory management bugs, memory leaks, buffer overflows, etc.
ensure that the application meets the performance baseline established during performance testing. This is done by running regression tests against the application at a specified maximum load.

Although performance testing and load testing can seem similar, their goals are different. On one hand, performance testing uses load testing techniques and tools for measurement and benchmarking purposes and uses various load levels. On the other hand, load testing operates at a predefined load level, usually the highest load that the system can accept while still functioning properly. Note that load testing does not aim to break the system by overwhelming it, but instead tries to keep the system constantly humming like a well-oiled machine.

In the context of load testing, I want to emphasize the extreme importance of having large datasets available for testing. In my experience, many important bugs simply do not surface unless you deal with very large entities such thousands of users in repositories such as LDAP/NIS/Active Directory, thousands of mail server mailboxes, multi-gigabyte tables in databases, deep file/directory hierarchies on file systems, etc. Testers obviously need automated tools to generate these large data sets, but fortunately any good scripting language worth its salt will do the job.

Stress testing

Stress testing tries to break the system under test by overwhelming its resources or by taking resources away from it (in which case it is sometimes called negative testing). The main purpose behind this madness is to make sure that the system fails and recovers gracefully -- this quality is known as recoverability.

Where performance testing demands a controlled environment and repeatable measurements, stress testing joyfully induces chaos and unpredictability. To take again the example of a Web application, here are some ways in which stress can be applied to the system:
double the baseline number for concurrent users/HTTP connections
randomly shut down and restart ports on the network switches/routers that connect the servers (via SNMP commands for example)
take the database offline, then restart it
rebuild a RAID array while the system is running
run processes that consume resources (CPU, memory, disk, network) on the Web and database servers

I'm sure devious testers can enhance this list with their favorite ways of breaking systems. However, stress testing does not break the system purely for the pleasure of breaking it, but instead it allows testers to observe how the system reacts to failure. Does it save its state or does it crash suddenly? Does it just hang and freeze or does it fail gracefully? On restart, is it able to recover from the last good state? Does it print out meaningful error messages to the user, or does it merely display incomprehensible hex codes? Is the security of the system compromised because of unexpected failures? And the list goes on.

Tuesday, April 28, 2009

Test Plan Evaluation Model

Test Plan Evaluation Model
The answer to the question “How good is this test plan?” can only be given with reference to an idea of
what a test plan should be. Although there are a number of public standards that specify test plan document
formats, they provide little basis for distinguishing a better plan from a worse plan. This model identifies
basic concepts, functions that a test plan serves, criteria that a test plan should satisfy, and some heuristics
to assist in determining if the criteria are satisfied with respect to the functions:
Terms and Concepts
 Test Plan. The test plan is the set of ideas that guide or represent the intended test process.
Often those ideas are only partially documented, spread across multiple documents, and
subject to change as the project evolves.
 Test Plan Document. A test plan document is any document intended to convey test plan
information. However, test plan documents are not the only source of information about the
test plan. Test plan information is also contained in the oral tradition of the project and the
culture of the company.
 Test Strategy. The test strategy is the way tests will be designed and executed to support an
effective quality assessment. Test strategy is the plan for what parts of the product will be
covered by tests and what test techniques will be used. Test strategy is distinct from the
logistics of implementing the strategy. Test strategy is essentially the “brains” of the test
process.
 Test Project. The test project is the means by which the test strategy is implemented and
results delivered. The test project is the “brawn” of the test process.
Test Plan Functions
Test plan functions are what a test plan is supposed to do. Below is a list of functions served by an ideal
test plan. However, a test plan document may only address a subset of these functions—the rest handled in
other documents or managed directly by the test manager or individual tester without the support of any
document. Thus, a test plan should be judged only with regard to those functions that it intends to serve, or
are insufficiently served by other means.
 Support the development of a quality assessment that enables wise and timely decisions to
be made concerning the product.
 Describe and justify the test strategy (including proposed test coverage) in relation to
technical requirements and technical risk. Promote awareness of the benefits and limitations
of the test strategy.
Page 2 of 5
 Describe and justify any special requirements or entry criteria that must be met in order for
the test project to proceed, as well as any exit or process for determining when to stop
testing.
 Support the initiation and organization of the test project, including preparations, staffing,
delegation of responsibilities, facility acquisition, task planning, and scheduling.
 Support daily management and evaluation of the test project and test strategy.
 Support effective coordination, collaboration, and other relations among members of the test
team, and between the test team and the rest of the project.
 Identify and manage any risks or issues that may impact the project.
 Specify the deliverables of the test project, and the delivery process.
 Record historical information in support of process audits, process improvement and future
test projects.
Test Plan Quality Criteria
These criteria relate to how well a test plan performs its functions. A test plan is good to the extent that it
satisfies these criteria. Exactly how good is “good enough” depends on situational factors and judgments.
 Usefulness. Will the test plan effectively serve its intended functions?
 Accuracy. Is it accurate with respect to any statements of fact?
 Efficiency. Does it make efficient use of available resources?
 Adaptability. Will it tolerate reasonable change and unpredictability in the project?
 Clarity. Is the test plan self-consistent and sufficiently unambiguous?
 Usability. Is the test plan document concise, maintainable, and helpfully organized?
 Compliance. Does it meet externally imposed requirements?
 Foundation. Is it the product of an effective test planning process?
 Feasibility. Is it within the capability of the organization that must perform it?
Test Plan Heuristics
In order to determine how well the test plan meets the criteria, heuristics are used. That is to say, a test plan
evaluation is based on generally accepted rules of thumb we have collected through experience and study.
Each of the heuristics in the table below relates to one or more of the criteria and functions identified
above. The only criterion in the list for which there is no corresponding heuristic is compliance. This is
because compliance to externally imposed requirements requires specific knowledge of those
requirements.
Each heuristic is described in terms of a general rule, and a brief basis for that rule. The basis is intended to
help determine when and where a heuristic applies.
Page 3 of 5
Heuristic Basis for heuristic
1. Testing should be optimized to find
important problems fast, rather than
attempting to find all problems with equal
urgency.
The later in the project that a problem is found, the
greater the risk that it will not be safely fixed in
time to ship. The sooner a problem is found after it
is created, the lesser the risk of a bad fix.
2. Test strategy should focus most effort on
areas of potential technical risk, while still
putting some effort into low risk areas just in
case the risk analysis is wrong.
Complete testing is impossible, and we can never
know if our perception of technical risk is
completely accurate.
3. Test strategy should address test platform
configuration, how the product will be
operated, how the product will be observed,
and how observations will be used to
evaluate the product.
Sloppiness or neglect within any of these four
basic testing activities will increase the likelihood
that important problems will go undetected.
4. Test strategy should be diversified in terms
of test techniques and perspectives. Methods
of evaluating test coverage should take into
account multiple dimensions of coverage,
including structural, functional, data,
platform, operations, and requirements.
No single test technique can reveal all important
problems in a linear fashion. We can never know
for sure if we have found all the problems that
matter. Diversification minimizes the risk that the
test strategy will be blind to certain kinds of
problems.
5. The test strategy should specify how test
data will be designed and generated.
It is common for the test strategy to be organized
around functionality or code, leaving it to the
testers to concoct test data on the fly. Often that
indicates that the strategy is too focused on
validating capability and not focused enough on
reliability.
6. Not all testing should be pre-specified in
detail. The test strategy should incorporate
reasonable variation and make use of the
testers’ ability to use situational reasoning to
focuse on important, but unanticipated
problems.
A rigid test strategy may make it more likely that a
particular subset of problems will be uncovered,
but in a complex system it reduces the likelihood
that all important problems will be uncovered.
Reasonable variability in testing, such as that
which results from interactive, exploratory testing,
increases incidental test coverage, without
substantially sacrificing essential coverage.
7. It is important to test against implied
requirements—the full extent of what the
requirements mean, not just what they say.
Testing only against explicit written requirements
will not reveal all important problems, since
defined requirements are generally incomplete and
natural language is inherently ambiguous.
Page 4 of 5
Heuristic Basis for heuristic
8. The test project should promote
collaboration with all other functions of the
project, especially developers, technical
support, and technical writing. Whenever
possible, testers should also collaborate with
actual customers and users, in order to better
understand their requirements.
Other teams and stakeholders often have
information about product problems or potential
problems that can be of use to the test team. Their
perspective may help the testers make a better
analysis of risk. Testers may also have information
that is of use to them.
9. The test project should consult with
development to help them build a more
testable product.
The likelihood that a test strategy will serve its
purpose is profoundly affected by the testability of
the product.
10. A test plan should highlight the non-routine,
project-specific aspects of the test strategy
and test project.
Virtually every software project worth doing
involves special technical challenges that a good
test effort must take into account. A completely
generic test plan usually indicates a weak test
planning process. It could also indicate that the test
plan is nothing but unchanged boilerplate.
11. The test project should use humans for what
humans do well and use automation for
what automation does well. Manual testing
should allow for improvisation and on the
spot critical thinking, while automated
testing should be used for tests that require
high repeatability, high speed, and no
judgment.
Many test projects suffer under the false belief that
human testers are effective when they use
exactingly specified test scripts, or that test
automation duplicates the value of human
cognition in the test execution process. Manual
and automated testing are not two forms of the
same thing. They are two entirely different classes
of test technique.
12. The test schedule should be represented and
justified in such a way as to highlight any
dependencies on the progress of
development, the testability of the product,
time required to report problems, and the
project team’s assessment of risk.
A monolithic test schedule in a test plan often
indicates the false belief that testing is an
independent activity. The test schedule can stand
alone only to the extent that the product the highly
testable, development is complete, and the test
process is not interrupted by the frequent need to
report problems.
13. The test process should be kept off of the
critical path to the extent possible. This can
be done by testing in parallel with
development work, and finding problems
worth fixing faster than the developers fix
them.
This is important in order to deflect pressure to
truncate the testing process.
Page 5 of 5
Heuristic Basis for heuristic
14. The feedback loop between testers and
developers should be as tight as possible.
Test cycles should be designed to provide
rapid feedback to developers about recent
additions and changes they have made
before a full regression test is commenced.
Whenever possible testers and developers
should work physically near each other.
This is important in order to maximize the
efficiency and speed of quality improvement. It
also helps keep testing off of the critical path.
15. The test project should employ channels of
information about quality other than formal
testing in order to help evaluate and adjust
the test project. Examples of these channels
are inspections, field testing, or informal
testing by people outside of the test team.
By examining product quality information
gathered through various means beyond the test
team, blind spots in the formal test strategy can be
uncovered.
16. All documentation related to the test
strategy, including test cases and procedures,
should be undergo review by someone other
than the person who wrote them. The review
process used should be commensurate with
the criticality of the document.
Tunnel-vision is the great occupational hazard of
testing. Review not only helps to reveal blind spots
in test design, but it can also help promote dialog
and peer education about test practices.

Thursday, April 23, 2009

QA Tips

1 Document Your Policies

You should ensure that you document policies for your project – remember that it can be difficult to implement quality if there isn’t a shared understanding across your project of what you are seeking to achieve. For example, see the QA Focus policies on Web standards and link checking .

2 Ensure Your Technical Infrastructure Is Capable Of Implementing Your Policies

You should ensure that your technical infrastucture which is capable of implementing your policies. For example, if you wish to make use of XHTML on your Web site you are unlikely to be able to achieve this if you are using Microsoft Word as your authoring tool.

3 Ensure That You Have The Resources Necessary To Implement Your Policies

You should ensure that you have the resources needed to implement your policies. This can include technical expertise, investment in software and hardware, investment in training and staff development, etc.

4 Implement Systematic Checking Procedures To Ensure Your Policies Are Being Implemented

Without systematic checking procedures there is a danger that your policies are not implemented in practice. For example, see the QA Focus checking procedures for Web standards and link checking .

5 Keep Audit Trails

Provide audit trails to record results of checking procedures. This can help spot trends which may indicate procedural failures (for example, a sudden growth in the numbers of non-compliant HTML resources may be due to deployment of a new authoring tool or inadequate training for new members of the project team).

6 Learn From Others

Rather than seeking to develop quality assurance policies and procedures from scratch you should seek to learn from others. You may find that the QA Focus case studies provide useful advice which you can learn from.

7 Share Your Experiences

If you are in the position of having deployed effective quality assurance procedures it can be helpful for the wider community if you share your approaches. For example, consider writing a QA Focus case study .

8 Seek ‘Fitness For Purpose’ – Not Perfection

You should seek to implement ‘fitness for purpose’ which is based on the levels of funding available and the expertise and resources you have available. Note that perfection is not necessarily a useful goal to aim for – indeed, there is a danger that ‘seeking the best may drive out the good’.

9 Remember That QA Is For You To Implement

Although the QA Focus Web site provides a wide range of resources which can help you to ensure that your project deliverables are interoperable and widely accessible you should remember that you will need to implement quality assurance within your project.

10 Seek To Deploy QA Procedures More Extensively

Rather than seeking to implement quality assurance across your project, it can be beneficial if quality assurance is implemented at a higher level, such as within you department or organisation. If you have an interest in more widespread deployment of quality assurance, you should read about the ISO 9000 QA standards .

Wednesday, April 22, 2009

The Complete Solution for Testing Mobile Devices

The Java Device Test Suite simplifies quality assurance and reduces time-to-market for Java ME implementations by providing comprehensive tests and a robust test manager. These enable suite users to evaluate, validate, and verify the quality of implementations of the Connected Limited Device Configuration (CLDC) and the Mobile Information Device Profile (MIDP) on a particular device. The Java Device Test Suite helps device manufacturers and service providers ensure their reputation for quality, while building customer satisfaction and loyalty.

Designed to reduce complex, in-house development and test management of multiple devices, the Java Device Test Suite meets the industry's need for a comprehensive, off-the-shelf software solution. It helps lower engineering costs by standardizing and simplifying testing, and by minimizing the need to write quality assurance tests manually.


Cost Reductions from Comprehensive, Simplified Tests

With the Java Device Test Suite, each device can be tested against thousands of test cases that have been written and tested against the reference implementation for each technology. These test cases can be divided into four categories:

  • Functional tests assure that the implementation behaves correctly, as intended. They imitate real applications and their interaction with external components, such as message senders and receivers.
  • Stress tests reveal the robustness of a device by stretching it to the limits of memory and processor resources. These tests also exercise implementation response to boundary conditions, such as maximum message sizes and multithreaded invocations.
  • Performance tests measure the time a device consumes to perform operations or combinations of operations.
  • Security tests verify sandbox boundaries and privileges of MIDlets, and also verify that devices correctly implement the MIDP 2.0 security model, including authentication, signing, and permissions.

Developers may choose from automated tests, which don't require user interaction, and interactive tests, which rely on users' feedback. All tests cover devices that adhere to CLDC and MIDP specifications.


Flexible, Easy-to-Use Modular Design

Users can easily select, configure, and execute test suites through the Test Console, which also automatically generates security certificates for MIDP testing. These highly customizable test suites may be configured to match device specifications. Tests are executed on the target device through a Test Agent, which has a small footprint that allows it to run on most devices, and enables developers to browse test results and device reports conveniently. The Test Console provides access to the central installation for device configurations, test suites, and specifications, simplifying the entire testing procedure.

The modular design of the Java Device Test Suite enables users to plug in additional test suites for new APIs and to execute selective test cases, as well as to build or plug in customized tests of specific functional areas, easily and rapidly. To match device configurations, the Test Manager makes possible the creation and editing of unlimited device profiles.


Faster Test Execution

The comprehensive Java Device Test Suite includes several features designed to speed test execution:

  • Parallel execution is supported, enabling the test execution load to be distributed over a number of devices.
  • Multiple test suites can be executed at once.
  • Several Test Consoles can be connected to the Test Manager concurrently, each of them testing multiple devices of the same configuration.

Working with the Technology Compatibility Kit

The Java Device Test Suite and the Technology Compatibility Kit (TCK) play complementary roles. The TCK verifies that the implementation is compatible and logically consistent with standards written in the specification at the API level, while the Java Device Test Suite tests the quality of the implementation: whether it is correct and robust. It does so by assembling into small applications separate features that the TCK tested independently, and confirming that they work together with the underlying operating system and hardware. To complete this task, the Java Device Test Suite actually performs operations, sends and receives data, simulates error conditions, and verifies that the implementation handles those conditions correctly.


Extensive Support Services and Maintenance

A broad range of support services is available for the Java Device Test Suite, including product upgrades, new features and enhancements, new test suites, on-site installation, configuration, training, technical consultation, and test development. Developers can take advantage of two weeks of on-site engineering services per year, technical assistance by phone and e-mail, and technical information on the Web.


Key Features

The Java Device Test Suite:

  • Comprehensive Tests: Unmatched breadth and depth of test coverage covering multiple Java technologies including JTWI, CLDC, MIDP, MMAPI, WMA and 3D Graphics
  • Benchmark Test Suite: Evaluate performance of Java on devices more thoroughly than any other existing benchmark on the market
  • Developer's Kit: Extend test coverage or include customized, user-defined test suites
  • Convenient Reporting: Provides test results and test execution reports in HTML format.
  • Parallel Execution: To distribute test execution load over multiple devices, speeding test execution time
  • Central Installation: Centrally stores device configurations, test suites, specifications, and administration to reduce maintenance costs and system complexity
  • Test Manager: enables creation and editing of unlimited device profiles to match device configurations
  • Test Console: Enables easy selection, configuration, and execution of test suites.
  • Device Readiness Suite: Quickly diagnose a new device's readiness to run standard JDTS test suites

Related Links